Kenmare WCP-B Plant

The Kenmare WCP-B plant being moved by road during its relocation

Projects / Kenmare WCP-B Plant

Kenmare WCP-B Plant

Floating structures, FEA, buoyancy, stability and mooring for Kenmare’s Wet Concentrator Plant B at Moma, Mozambique, from initial design through relocation, repairs and the 2025 upgrade.

21

Pontoons designed

146

Construction drawings

7,000 t

Plant relocated

23 km

Distance moved

The project

Every floating structure on the plant

Triton was contracted first by Aker Solutions and later by E-PC to design all of the floating structures on the Kenmare WCP-B plant, along with the strongback structures and the internal support stools for its high-load components.

  • 21 pontoons and support frames
  • Strongback structures
  • Support stools for the surge bin, sumps, pipe towers, pump stools and pipe bases
  • FEA, buoyancy, stability and mooring analysis
Aerial view of the floating WCP-B plant in its dredge pond

Project phases

Involved at every stage

The WCP-B plant floating in its pond

01Design

Initial design of the WCP-B plant

The 21 pontoons and all of the additional support structures were fabricated by SA Shipyards in Durban, then transported on barges to Moma, where they were assembled together with the plant above.

The WCP-B plant on transport supports

02Relocation · 2020

Relocation to Pilivili

In 2020, Kenmare relocated the 7,000-ton plant 23 km from the Namalope ore zone to the Pilivili ore zone, one of the largest moves of its kind.

Triton supported key structural and transport-related design: engineering verification, heavy-haul interface coordination, transport saddles, ground interface supports and operational planning.

The Deidre dredger at the WCP-B plant

03Repairs

Repairs and strengthening of the dredger

The WCP-B dredger, Deidre, was originally designed and built in the USA and assembled on site. Triton has been involved in numerous projects to deal with cracking and freeboard issues.

Aerial view of the updated WCP-B plant

04Upgrade · 2025

The 2025 plant update for Hatch

Stability and finite element analysis of the 2025 plant update, carried out for Hatch.

On the move

Moving a 7,000-ton plant 23 km

More for Kenmare

Related work

Related

Transhipment vessel “PEG”

A propulsion refit on Kenmare’s transhipment barge at their Mozambique mineral sand mine.

Learn more →

Related

Plant relocation

More on the 2020 move of WCP-B from Namalope to Pilivili.

Learn more →

Related

Marine & mining structures

Our wider work on floating plants, pontoons and mining structures.

Learn more →

Planning a floating plant or relocation?

Talk to the team that has supported Kenmare’s WCP-B from design to relocation.